I-35W bridge construction 6/08 (6.5 minutes) Individual image access 07:57 17 Focus moves to N side of river 08:23 41 Crane barge tilts forward in response to lifting segment (deduced) Note: Appearance of this slide show 08:31 48 Segment lifted into view seems to depend a lot on how fast 08:38 56 Segment at about final height your connection allows the download 08:58 76 Last visible movement of segment into place of images. If your connection is 09:33 111 Last visible sunlight thru crack slow the program proceeds to the 09:54 130 Crane barge tilts back in response to lowering segment (deduced) next image before the current image 09:58 135 Crane attachment swings free has been displayed adequately, 10:23 159 SECOND segment lifted into view resulting in a flashing effect. 10:33 168 Second segment at about final height Even with a faster connections, this 10:45 181 Last visible movement of segment into place may happen if the connection is 11:21 217 Last visible sunlight thru crack being shared e.g. for streaming 11:37 232-233 Crane barge tilts back in response to lowering segment (deduced) audio or a download. 11:44 238 Crane attachment swings free 12:06 260 Barge with red crane starts to move up river The second time thru the slide show 12:33 286 Camera focus changes to S side / up river may be better if your system caches 13:21 332-345 small boat comes down river thru lock the images. 13:34 345+ Tugs move barge with red crane 13:47 357-381 full cargo barge goes upriver thru lock 14:27 394 last picture this day